thermalPowerOnDelay
BRCM-THERMAL-MGMT-MIB ·
.1.3.6.1.4.1.4413.2.2.2.1.11.1.4
Object
scalar r/w
250 MillisecondsUnsigned32
This delay specifies the time between the Thermal Shutdown Controller detecting that the Power On Threshold has been reached and when it actually switches the unit back on. Its purpose is to allow power on the remainder of the board to stabilize. Serial communications are blocked during this delay, so it should be chosen carefully. The delay is specified in multiples of 50 milliseconds 2 to 50 ( 100ms - 2500ms ). The default is value is 5 yielding a delay of 250ms.
Context
- MIB
- BRCM-THERMAL-MGMT-MIB
- OID
.1.3.6.1.4.1.4413.2.2.2.1.11.1.4- Type
- scalar
- Access
- readwrite
- Status
- current
- Units
- 250 Milliseconds
- Parent
- thermalMgmtBase
Net-SNMP examples
How SNMP and these commands workScalars have one instance, identified by the .0 suffix.
Read the scalar instance
/usr/bin/snmpget -v2c -c '<community>' -Pud -Ir -OQUv -m 'BRCM-THERMAL-MGMT-MIB' -M '/opt/observium/mibs/broadcom:/opt/observium/mibs/rfc:/opt/observium/mibs/net-snmp' 'udp:<hostname>:161' 'BRCM-THERMAL-MGMT-MIB::thermalPowerOnDelay.0'
More examples
Translate to a numeric OID
/usr/bin/snmptranslate -Pud -Ir -On -m 'BRCM-THERMAL-MGMT-MIB' -M '/opt/observium/mibs/broadcom:/opt/observium/mibs/rfc:/opt/observium/mibs/net-snmp' 'BRCM-THERMAL-MGMT-MIB::thermalPowerOnDelay'
Syntax
250 MillisecondsUnsigned32
Values & Constraints
Object Constraints
range: 2-50